The private label supplement timeline follows a predictable 4–8 week cycle from consultation to delivery, with the exact duration depending on your project complexity. Here is how each phase breaks down.
Week 1–2: Consultation & Formula Selection — We discuss your requirements, review available formulations that match your product category, and confirm the specification. Stock formulas move through this phase quickly. If you need parameter adjustments (flavor, potency, color), add approximately 1–3 weeks.
Week 2–4: Artwork & Packaging Preparation — You submit your label design or brief. Our team reviews it for regulatory compliance and production compatibility. Packaging materials are sourced and prepared in parallel. External artwork revisions can extend this phase.
Week 3–5: Pilot Batch Production — A small branded batch (50–200 units) is produced with your actual label and packaging for your evaluation and approval.
Week 1–2: Define requirements, review formulations, confirm specification. Add 1–3 weeks for custom adjustments.
Week 2–4: Submit label design, regulatory review, source packaging materials. External revisions may extend timeline.
Week 3–5: 50–200 branded units with your label and packaging. 2–3 weeks after artwork finalization.
Week 5–6: Full production begins after pilot approval. 2–3 weeks for standard private label orders.
Week 6–8: Final quality inspection, export packing, and shipment.

Quality assurance at every stage

Finished goods ready for delivery